|
| |
| |
| News |
 |
| |
|
|
|
|
|
| |
|
Two gas & steam turbines manufactured in early October 2009 (New)
|
 |
|
One V.94.2 gas turbine with 162 MW power output (ISO Condition) and one E-type steam turbine with 159 MW power output, have been manufactured and shipped to the following power plants:
- Ouromiyeh power plant (6th gas turbine unit)
- Yazd solar power plant (steam turbine)
|
| |
|
|
|
|
|
|