MAPNA Signs Deal on Semnan Power Plant 2nd Phase Implementation
تاریخ خبر : 29 آذر 00

نخستین توربین کلاس F گروه مپنا به نیروگاه اندیمشک بارگیری شد

MAPNA Group has signed a deal with Mines and Metals Development Investment Company (MMDIC) to develop the second phase of Semnan Power Plant, located in the namesake province.

The contract was signed on Monday December 20, 2021, by MAPNA Group President Abbas Aliabadi and MMDIC Managing Director Amirhossein Naderi.

The EPC deal stipulates design, engineering, procurement, installation and commissioning of two advanced gas units equipped with MAPNA’s own E-Class MGT-70(3) gas turbines with a nominal capacity of 366MW at ISO conditions.

Saman Semnan Power Generation Company is the client of the project and MAPNA Power Plants Construction & Development Company (MD1) is the contractor.

The first phase of Semnan Power Plant comprised two gas units with a capacity of 162 MW each (324 MW in total) at ISO conditions.

The plant is located 10 km from Semnan on the road to Damghan. All the units of the power plant have been delivered to the client on provisional (PAC) basis.

The capacity of the substation of Semnan Power Plant is 400 kV and engineering, procurement and construction of the project have been defined within the scope of the activities of the project client.

MANPA MD-1 Company started construction operations of the power plant’s first phase on January 15, 2009 and the first unit of the power plant was synchronized to the grid on December 25, 2010, about two years after the launch of the project. The project has been accomplished on the basis of the approved strategy within the framework of a contract for 22 units in engineering, procurement and implementation sectors.


نام
ایمیل (محرمانه)
تلفن (محرمانه)